Copy

Eradicate Rising Damp on the First Attempt with the Dryzone System

Rising damp is stressful to deal with for the homeowner. Surveyors need to be found, the source of the problem identified and the correct contractors chosen. Then the homeowner has to deal with the disruption of the treatment and repairs actually being carried out, which can take several days. 

So imagine the horror if the rising damp problem returns on the treated wall several months or years down the line! This can often happen if a cheaper low-strength cream is chosen to treat rising damp. Even if the correct materials are used to carry out the treatment, installation error can still lead to a damp-proof course failure.
Needing to retreat the problem causes the homeowner more stress and damages the contractor's reputation. Choosing the right materials and installation method is vital to make sure the rising damp is eliminated for good.
The Dryzone System and Dryrod Damp-Proofing Rods ensure that rising damp is treated first time. They can also be used to retreat failed damp-proof course treatments, without the need to drill new injection holes. Click below to read our in-depth look at the reasons behind rising damp treatment failure.
Click Here to Find Out More

The Dryzone System Range

The Dryzone System is the complete rising damp renovation range for internal walls. It contains all products required to eliminating rising damp, replaster and redecorate damp and salt-contaminated walls.

Find out more

A Safeguard Europe Product

The Dryzone System range is developed by Safeguard Europe Ltd, the UK's leading developer, manufacturer & supplier of damp-proofing and waterproofing materials to the construction industry.

Find out more

Copyright © 2019 Safeguard Europe Ltd, All rights reserved.


Want to change how you receive these emails?
You can update your preferences or unsubscribe from this list