Copy
Hexa Watches Progress Update #2

K500 Premier Edition:
Progress Update 2

K500 PROTOTYPE IN PROGRESS:
Engineering is complete.

We are pleased to report that engineering has been completed for the K500 prototype. The above image shows some detail of the mechanical drawings being developed for prototype production. We look forward to showing off the the K500 in the metal.


OVER 160 RESERVATIONS SO FAR.

Thanks to all the Hexa reservation holders around the world. If you are considering reserving a watch, remember that the first 250 on the list will receive the following:
  • SPECIAL PRE-SALE PRICING
  • FIRST RESERVATIONS ON FUTURE PRODUCTS
  • RECOGNITION BY NAME IN THE OWNERS MANUAL
  • LIFETIME TIMING ADJUSTMENTS FREE OF CHARGE
RESERVE YOUR K500 TODAY
http://www.hexawatches.com/reserve.html

Copyright © 2011 Hexa Watches, All rights reserved.
Email Marketing Powered by Mailchimp